PPAP Checklist — 18 Elements, Submission Levels and AS9102 FAI
A PPAP package is the evidence that a supplier can make a part to the drawing, repeatably, with a process under control. AIAG defines eighteen elements of that evidence and five submission levels. The single most expensive misunderstanding in supplier quality is reading the level as a list of what must exist: it is not. Every element must exist and be retained at every level. The level only decides what the customer sees.
Formula
Worked example
A machined part is being submitted at PPAP level 3. Two of the eighteen elements are correctly not applicable: the design FMEA (the customer owns the design) and the appearance approval report (no appearance requirement). Eleven of the remaining sixteen are complete. The five still open are customer engineering approval, initial process studies, master sample, checking aids, and customer-specific requirements.
- Applicable elements = 18 − 2 = 16
- Readiness = 11 / 16 = 0.688, or 68.8%
- At level 3, master sample and checking aids are RETAIN; the other three open elements are SUBMIT
- Blockers = 3 (customer engineering approval, initial process studies, customer-specific requirements)
The package is 68.8% ready and the warrant cannot be signed: three elements the level requires you to submit are still open. The master sample and checking aids do not block the submission, but they are not optional either — they must exist and be produceable on request. Note that dropping to level 2 would not help: initial process studies and customer-specific requirements are still submit-required, and level 1 would leave the Ppk study owed to the customer anyway.
How to interpret the result
| Level 1 | Warrant only, plus the appearance approval report for appearance items. Everything else retained at the supplier. |
| Level 2 | Warrant with product samples and limited supporting data — typically design records, dimensional and material results, and lab documentation. |
| Level 3 | The default. Warrant with product samples and the complete supporting data package. |
| Level 4 | Warrant plus whatever the customer defines. Get the element list in writing before you build the package. |
| Level 5 | Warrant with samples and complete data reviewed at the supplier manufacturing location, so records are shown on site rather than sent. |
Common mistakes
- Reading RETAIN as "not required". Retained elements must exist, be complete, and be produceable on request during an audit. A level 1 submission is a small envelope, not a small workload.
- Submitting initial process studies below the customer threshold and expecting approval anyway. Ppk of 1.67 is the common requirement for a new process; 1.33 is an ongoing-production figure and is usually not enough at submission.
- Marking the design FMEA not applicable when the supplier is in fact design responsible. Who owns the drawing decides this, not who drew it most recently.
- Running the initial process study on a pilot or soft-tooled run. PPAP requires significant production from production tooling, process, operators and rate — a study from anything else does not describe the process the customer will receive.
- Signing the warrant before dimensional results cover every characteristic on the drawing. Partial dimensional coverage is the most common reason a package is returned.
- Treating AS9102 first article inspection and AIAG PPAP as interchangeable. They answer the same question with different evidence and different forms; an aerospace customer asking for an FAI will not accept a PPAP package instead.
Frequently asked questions
- What are the 18 PPAP elements?
- Design records; authorised engineering change documents; customer engineering approval; design FMEA; process flow diagram; process FMEA; control plan; measurement system analysis; dimensional results; material and performance test results; initial process studies; qualified laboratory documentation; appearance approval report; sample production parts; master sample; checking aids; customer-specific requirements; and the part submission warrant.
- What is the difference between PPAP level 1 and level 3?
- Only what is sent. Level 1 submits the part submission warrant alone and the supplier retains the rest; level 3 submits the warrant with samples and the complete supporting data package. Both require every applicable element to exist. Level 3 is the default unless the customer specifies otherwise.
- Is PPAP the same as first article inspection?
- No. PPAP is the AIAG automotive process built around eighteen elements and a part submission warrant. FAI is the aerospace equivalent defined in SAE AS9102, built around three forms: part number accountability, product accountability for materials, special processes and functional testing, and characteristic accountability for every feature on the drawing. The underlying question is the same, but the deliverables are not interchangeable.
- What Ppk does PPAP require?
- For a new process, customers commonly require Ppk of at least 1.67 on special or critical characteristics at submission, with 1.33 as the minimum for ongoing production once the process is stable. Below the threshold the supplier is expected to submit a corrective action plan and an interim containment, typically 100% inspection, with the package.
- When is a new PPAP needed?
- On any change to the product or the process that could affect conformance: a drawing or specification change, new or refurbished tooling, a change of material or sub-supplier, a change of manufacturing location or process, a change in inspection method, or production resuming after a lapse of twelve months or more. When in doubt, notify the customer and let them decide — unreported change is a far more serious finding than an unnecessary submission.
Related tools
About Reliability Pro
PPAP / FAI Readiness is part of a suite of 188 reliability, maintenance and quality engineering tools covering life data analysis, accelerated testing, system reliability, FMEA and root cause, SPC, and design for reliability. It runs in the browser and as native iOS and Android apps, so the same calculation is available at a desk or in front of the asset.